Project Name
UMHP – 46.25* MW
Upper Myagdi Hydroelectric Project
Project Description
+ Headrace Tunnel Length : 3866 m ,
+ Total Steel Penstock Pipe : 804.50 m ,
+ Installed Capacity : 46.25* MW ,
+ Construction Period : 3 years
Upper Myagdi Hydroelectric Project 46.25* MW
Project Summary
Project Development Highlights
- Hydrology Study: Accurate river flow analysis for safe and optimized planning.
- Civil Construction: Foundation and water diversion structures ensuring strength and stability.
- Tunnel Excavation: Smooth water conveyance through engineered tunnels.
- Electromechanical Works: Installation of turbines and generators for efficient power generation.